No Rot. No Rust. No Problem.
Pearson Pilings - Driven to Last

Pearson Pilings Featured Project

New State-of-the-Art Launching Facility!

Falls Township, PA An all-new, public access boat ramp and 2500-feet of floating docks were built at Quaker Penn Park, located 20-miles north of Philadelphia. The project was designed so all floating docks moved with the 8-foot tides. Committed to using sustainable materials, T&M Associates of Middletown, NJ, the engineering firm hired by the township, specified Pearson Fiberglass Pilings to secure the floating docks. Board Safe of Emmaus, PA built the custom docks, which used TimberStrong Deck Panels featuring GeoDeck composite decking.